Assam

Sonowal directs completion of embankment construction within May 30

Pratidin Bureau

Assam Chief Minister Sarbananda Sonowal on Wednesdayinspected the construction work of embankment by Water Resource Department fromMorihula to Agoratoli range as a protection measure for Kaziranga National Park(KNP). The CM directed the department to complete the embankment project withinMay 30.

The embankment project, funded by Asian Development Bank,would cover a total length of 23.38 kms and with a width of 7.5 m would protectthe KNP from floods and erosion.

Speaking to media, the CM informed that even though embankment work could not be started on time due to COVID-19 lockdown, State Government had started the construction work of embankments so that all these projects could be completed by May 30. In view of the impending floods from the month of June, the State Government was taking all steps to complete the embankment construction works within this month so that the people and property could be protected from the annual onslaughts of floods in the state.

During the visit, Water Resource Minister Keshab Mahanta, Agriculture Minister Atul Bora, MP Kamakhya Prasad Tasa, MLAs Mrinal Saikia and Bimal Bora, DC and SP Golaghat, SDO (C) Bokakhat accompanied the Chief Minister along with top officials of Water Resource Department.

India Unveils Power-Packed Squad for T20 World Cup 2024

Large Quantity of Cough Syrup and Ganja Seized in Tripura Operation

Major Drug Seizures in Mizoram: Heroin and Methamphetamine Worth Rs 10 Crore Seized

Free Health Camp Organized for Old Age Home in Guwahati

Married Woman Goes Missing From Guwahati's Narengi