Assam

High-Level Team of NEEPCO To Visit Kapili Hydro-Power Today

Pratidin Bureau

Four workersof Kapili Hydro-power still went missing on its third day after a pipelinecarrying water to the 275 MW hydel project in Dima Hasao district burst onMonday.

Four persons still feared trapped inside a pump. Although the water level in the Kapili River rises due to the burst of water pipe, it reduced a bit on Wednesday.

A high-level team of NEEPCO will visit the hydro-power project today to take stock of the situation.

Thepipe supplies 12000 liters of water per second from the NEEPCO reservoir toKapili hydro-power. The repairing work of the pipe was done last year and afterthat, no repairing was done resulting in the break-down of the pipe causinginjury to many people.

Accordingto reports, the pipe breaks down in the same place where the repairing wasdone.      

Dispur MLA Atul Bora to Forego Voting Tomorrow on Astrological Advice!

NIT Silchar Student Found Hanging Inside Bathroom; Probe On

Weather Forecast Poses Challenges for Third Phase of Elections in Assam

Elaborate Preparations Underway for Third Phase of Lok Sabha Elections in Assam

Stock Markets Close Flat After Initial Gains