Assam

Old-Saraighat Bridge To Remain Shut For 4 Days From Tomorrow

Pratidin Bureau

The Old Saraighat Bridge over the mighty Brahmaputra will remain closed from May 1 (Friday) due to maintenance work.

The traffic will bediverted to the new Saraighat bridge from 12:00 hrs of 01.05.2020 to 6:00 hrsof 04.05.2020.

Former ULFA Member Arrested for Illegal Weapon Trade in Assam's Tinsukia

Lok Sabha Polls Live: Assam Records 76.68% Turnout Till 10 PM

Assam: Bike Collides Head-On with EVM-Carrying Traveller in Boko, 2 Injured

Men With Higher Levels of Testosterone More Likely to Develop AFib, Study Finds

BJP Govt in Minority as 3 Independent MLAs Withdraw Support in Haryana